Skip to main content

The University of La Laguna (ULL) improves its infrastructure and equipment with a state grant of 3.5 million euros

Tuesday April 28, 2026 - 13:19 CEST

The University of La Laguna has implemented an ambitious program of improvements to its infrastructure and equipment, funded through a grant under Law 22/2021, the General State Budget Law. The project represents a total investment of €3,513,937.16, of which €3,500,000 was subsidized.

The set of interventions has made it possible to modernize facilities, optimize teaching and research spaces, and improve energy efficiency on different university campuses, contributing to raising the standards of quality, safety and sustainability of the institution.

Laboratorio 3 del Departamento de Farmacología.

Laboratory 3 of the Department of Pharmacology.

One of the main lines of action has been the improvement of laboratories, focused on updating spaces that are considerably old. The interventions have included comprehensive renovations, renewal of electrical installations, incorporation of ventilation and air conditioning systems, as well as the provision of specialized furniture.

Among the most noteworthy projects are the renovation of the Nutrahlipids laboratory on the Anchieta Campus, the modernization of the Pharmacology laboratory, and improvements to the Neurobiology and Experimental Neurology laboratory in the Health Sciences building. New spaces, such as the archaeobotany laboratory, have also been created, and safety measures have been enhanced through the installation of extraction systems in engineering laboratories.

In the teaching field, actions have been taken to improve the functionality and comfort of classrooms. These include the unification of spaces in the Faculty of Physics and Mathematics, the electrification of classrooms in various faculties, and the improvement of electrical installations in lecture halls.

Climate control systems have also been installed in study areas, contributing to more suitable learning environments. The project has also included the creation of new shared spaces that foster collaboration and university life, such as a coworking area in the Nautical building and an office in the Rectorate, thus improving interaction spaces for the university community.

Laboratorio del grupo de investigación NUTRAHLIPIDS ue recibió financiación de la ULL para su remodelación y mejora.

Laboratory of the NUTRAHLIPIDS research group that received funding from the ULL for its remodeling and improvement.

Another key area of focus has been the renovation of teaching and non-teaching spaces, with projects aimed at improving accessibility, safety, and the overall condition of the facilities. These include the adaptation of accessible restrooms, the renovation of offices, the upgrading of electrical systems, and the refurbishment of administrative and common areas.

This academic center has reinforced its commitment to sustainability by installing photovoltaic systems for self-consumption in numerous university buildings, as well as other energy efficiency initiatives. These include rainwater harvesting systems, replacement of equipment and facilities, and improvements to key infrastructure, all contributing to reduced energy consumption and environmental impact.

Overall, the actions undertaken have led to a significant improvement in the functional, technical, and safety conditions of the university's infrastructure. The project represents a strategic step forward in the modernization of the University of La Laguna, reinforcing its commitment to quality teaching, research, and sustainability.

Attachment with more images


Filed under: Outstanding, Institution, ULL Cover